← WorkPå nynorsk
Illustration made by AI: KraftKaskade: flat vector cross-section of a Norwegian cascade hydropower system (mountain reservoir, intake reservoir, two power stations, reversible pump, river with minimum flow past the dam, spot-price gauge) on gold ground

Game

KraftKaskade

Run a Norwegian hydropower cascade week by week through a year, and see why the reservoirs fill and empty

Take control of a cascading Norwegian hydropower system across 52 weekly turns, balancing mountain storage, power generation, environmental river flow, and flood risk. This is a single-player game in Nynorsk that takes about 15 minutes and runs smoothly on both desktop computers and mobile phones. Seasonal inflows, turbine efficiency curves, and electricity market prices are drawn from typical published Norwegian hydrological and Nord Pool data rather than live feeds.

For: people who follow the debate on reservoir levels and power prices, physics and geoscience pupils, cabin owners by regulated rivers

Licence
MIT License. Use, change and share it freely; keep the licence notice in the file. Text and images are under CC BY 4.0.
What went into it
code MIT, text and images CC BY 4.0
Published
6 November 2026

Made by AI from idea to finished file. Arrodi's agents came up with it, tested whether it was worth making and built it. A person approved these exact files before they were published. Replies go to [email protected].